Red River Métis Homeland · RM of Rosser, Manitoba

Fifty homes. Ten years. One community that owns itself.

A winterized micro-home village for low-income and welfare-reliant Red River Métis citizens, on 4 acres at the Winnipeg boundary — built to code, tied into municipal water, sewer, and Manitoba Hydro, and financed so that every dollar of rent builds resident equity instead of someone else's portfolio.

50
Winterized 1 & 2-bedroom units
4
Acres, fully serviced
$600
Monthly, matching the EIA shelter cap
12
Months from rezoning to move-in

A village engineered for a Manitoba winter and a fixed-income budget.

Sub-arctic by design

3" closed-cell foam, insulated frost skirting, mandatory HRVs, and utilities buried 8 feet below grade.

Hydronic + solar

One central boiler feeding subfloor PEX in every home, with a net-billed commercial array on the Hub roof.

$600 that buys a home

The exact Manitoba EIA shelter maximum — $250 of it lands in the resident's own equity escrow.

Métis hands, Métis wages

100% on-site Métis labour with an apprentice training loop running the full assembly line.

Food sovereignty

2.5 acres of garden and a commercial greenhouse returning produce to residents at no cost.

Children first

A fully car-free interior: play area and gardens reachable without crossing a single road.

The $600 model

Every dollar accounted for, no interest, no developer markup.

Capital construction — $30,000 true raw cost per unit — is cleared upfront through federal and institutional grants. What remains is an operating budget that matches the individual Manitoba EIA shelter maximum exactly, with $250 a month flowing into the resident's own asset escrow. Leave before year ten and the Métis Land Trust pays back every dollar of that escrow, in cash.

Model your own equity curve
  • True Equity Paydown

    Paid into the resident's home asset escrow. Full structural ownership at 120 months.

    $250
  • Rosser Water & Sewer

    Proportional share of the master municipal utility bill.

    $60
  • Hydro & Solar O&M

    Grid connection fees and solar operational maintenance.

    $40
  • Village Operations

    Communal property upkeep and fuel for the 15-passenger transit shuttle.

    $150
  • The Garden Dividend

    Bulk seeds, greenhouse tools, fertilizer. Returned 100% as fresh produce.

    $100
Total monthly cost$600

Twelve months, fixed

From rezoning to fifty families moved in.

  1. 01

    Month 1 – 3

    Approvals & Capital

    Rezoning, MMF funding approval, and municipal grid permits with the RM of Rosser.

  2. 02

    Month 3 – 5

    Heavy Civil Blitz

    Clearing the 4 acres, excavating the perimeter road and the 8-foot utility trenches.

  3. 03

    Month 5 – 6

    Gravel & Shell Delivery

    Front lot graveling, the 20-stall parking lot, and delivery of the bulk shed shells.

  4. 04

    Month 6 – 10

    Métis Apprentice Assembly Line

    On-site framing, spray-foam winterization, and hydronic PEX floor layouts by the Métis labour and apprentice loop.

  5. 05

    Month 9 – 11

    Hub, Solar & Boiler

    Central Communal Hub construction, solar array installation, and boiler activation.

  6. 06

    Month 11 – 12

    Occupancy & Move-In

    RM of Rosser master occupancy inspection, shuttle van launch, and 50-family move-in.

See the full delivery contract

The land stays with the trust. The homes belong to the families.

Title is held permanently by the Métis Land Trust to block corporate speculation, while residents build real, refundable equity in the structure they live in.